Feasibility report. Volume 6, Appendix C, Cost estimates, Final draft, November 1982 revisions /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Feasibility report. Volume 6, Appendix C, Cost estimates, Final draft, November 1982 revisions Title on table of contents page: Susitna Hydroelectric Project. Appendix C |
---|---|
Corporate Contributor(s): | Acres American Incorporated, Susitna Hydroelectric Project. Alaska Power Authority, |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1423 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1423. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02247cam a2200445Ia 4500 | ||
---|---|---|---|
001 | 2052282 | ||
003 | SIRSI | ||
005 | 20160415103722.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140819s1982 akua t s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA | ||
035 | |a (OCoLC)887916310 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1423 | |
088 | |a APA 1423 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Feasibility report. |n Volume 6, Appendix C, |p Cost estimates, Final draft, November 1982 revisions / |c prepared by Acres. |
246 | 3 | |a Susitna Hydroelectric Project. |p Feasibility report. |n Volume 6, Appendix C, |p Cost estimates, Final draft, November 1982 revisions | |
246 | 1 | |i Title on table of contents page: |a Susitna Hydroelectric Project. |n Appendix C | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a [3], 49, [1], 45, [4] p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
510 | 3 | |a Assigned APA Document no. 1423 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
710 | 2 | |a Acres American Incorporated, |e author. | |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority, |e issuing body. | |
787 | 0 | 8 | |i Replacement to Volume 6 of: |t Susitna Hydroelectric Project feasibility report. |b Final draft. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |r APA 174-182 |r SUS 38 |w (OCoLC)49820541 |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1423. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/14/APA1423.pdf |3 Direct link to Volume 6, Appendix C. |z ARLIS Document Server |
098 | |a APA 01423 | ||
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA174.html |3 Link to the feasability report (final draft) and list of all documents related to it. |z ARLIS Document Server |
596 | |a 9 10 |