Feasibility report, comprehensive bibliography : volume 1 and volume 2 /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Feasibility report, comprehensive bibliography : volume 1 and volume 2
Corporate Contributor(s):Alaska Power Authority,

Susitna Hydroelectric Project.

Acres American Incorporated,

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 3315
Series:Document (Susitna Hydroelectric Project) ; no. 3315.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02829cam a2200589Ia 4500
001 2052279
003 SIRSI
005 20160415103723.0
007 ta
007 cr bn||||a||||
008 140819s1982 aku b s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCF  |d RLA 
035 |a (OCoLC)887907914 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 3315 
088 |a APA 3315 
049 |a RLAA 
245 0 0 |a Feasibility report, comprehensive bibliography :  |b volume 1 and volume 2 /  |c prepared by Acres. 
246 1 |a Susitna Hydroelectric Project.  |p Feasibility report, comprehensive bibliography :  |b volume 1 and volume 2 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a [75] p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 3315 
500 |a Cover title. 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a "October 1982." 
500 |a Series statement from label on cover. 
500 |a Volume 1 comprises the first six pages; volume 2 comprises the remaining 69 pages. 
510 3 |a Assigned APA Document no. 3315 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Susitna Hydroelectric Project  |v Bibliography. 
650 0 |a Dams  |z Alaska  |z Susitna River  |v Bibliography. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |v Bibliography. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |v Bibliography. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Dams.  |2 fast  |0 (OCoLC)fst01198486 
650 7 |a Hydroelectric power plants.  |2 fast  |0 (OCoLC)fst00964930 
710 2 |a Alaska Power Authority,  |e issuing body. 
650 7 |a Water-power.  |2 fast  |0 (OCoLC)fst01172317 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
655 7 |a Bibliography.  |2 fast  |0 (OCoLC)fst01423717 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Acres American Incorporated,  |e author. 
710 2 |a HARZA-EBASCO Susitna Joint Venture.  |5 AkARLIS 
772 0 |t Susitna Hydroelectric Project feasibility report.  |b Final draft.  |d [Anchorage, Alaska] : Alaska Power Authority, [1982]  |r APA 174-182  |r SUS 38  |w (OCoLC)49820541 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3315. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/33/APA3315.pdf  |3 Direct link to the bibliography (volume 1 and volume 2).  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna/1/APA174.html  |3 Link to the feasability report (final draft) and list of all documents related to it.  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 03315