Consultants Meeting /

This document represents a meeting presentation. It outlines construction details on the Watana Dam and Devil Canyon Dam, required and planned activities, and updated information on the Susitna Hydroelectric Project, and contains short reports, charts, maps, and technical drawings.

Saved in:
Bibliographic Details
Alternate Title:Caption title on agenda page: Susitna Hydroelectric Project, External Review Panel, Meeting on Staged Construction : April 15 and 16, 1985, Sixth Floor Conference Room

Susitna Hydroelectric Project. Consultants Meeting
Corporate Author: Susitna Hydroelectric Project. External Review Panel. Meeting on Staged Construction (1985 : Anchorage, Alaska)
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 2653
Series:Document (Susitna Hydroelectric Project) ; no. 2653.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document represents a meeting presentation. It outlines construction details on the Watana Dam and Devil Canyon Dam, required and planned activities, and updated information on the Susitna Hydroelectric Project, and contains short reports, charts, maps, and technical drawings.
Physical Description:[120] p. : ill., charts, maps, plans ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"April 15, 1985."

The place of the meeting is not given, but it probably coincided with the Engineering Sub-Panel Meeting held April 16, 1985 in Anchorage.

Cataloging based on copy with incomplete chart of construction schedule (sheets 1 and 2 at the end) due to improper microfilming of original document.