Susitna transmission system status summary /
Saved in:
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
---|---|
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 2575 APA 2576 APA 2577 |
Edition: | Draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2575-2577. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02426cam a2200565Ia 4500 | ||
---|---|---|---|
001 | 2047357 | ||
003 | SIRSI | ||
005 | 20160428081106.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140716s1983 akuabd bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCF |d OCLCQ |d RLA | ||
035 | |a (OCoLC)883805635 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 2575-2577 | |
088 | |a APA 2575 | ||
088 | |a APA 2576 | ||
088 | |a APA 2577 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Susitna transmission system status summary / |c Harza-Ebasco Susitna Joint Venture. |
250 | |a Draft. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1983] | ||
300 | |a 3 volumes : |b illustrations, maps, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 2575-2577 | |
500 | |a "December 1983." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document numbers 2575-2577 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | 0 | |g v. 1. |t Technical, economic and environmental considerations. |g (APA 2575) -- v. 2. |t Appendices. (APA 2576) -- v. 3. |t Resource maps. |g (APA 2577). |
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Electric lines |z Alaska |x Planning. | |
650 | 0 | |a Electric power transmission |z Alaska |x Planning. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Electric lines |x Planning. |2 fast |0 (OCoLC)fst00905119 | |
650 | 7 | |a Electric power transmission |x Planning. |2 fast |0 (OCoLC)fst00905622 | |
650 | 7 | |a Planning. |2 fast |0 (OCoLC)fst01065224 | |
651 | 7 | |a Alaska. |2 fast |0 (OCoLC)fst01204480 | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2575-2577. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/25/APA2575.pdf |3 Direct link to the first volume (Technical, economic and environmental considerations). |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/25/APA2575.html |3 List of all volumes. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 02575 | ||
098 | |a APA 02576 | ||
098 | |a APA 02577 |