Feasibility level estimate.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Feasibility level estimate

Susitna Project. Feasibility level estimate
Corporate Contributor(s):Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Harza-Ebasco Susitna Joint Venture,
Report Numbers:APA 2541

APA 2542

APA 2543

APA 2544

APA 2545
Series:Document (Susitna Hydroelectric Project) ; no. 2541-2545.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • v. 1.
  • Watana.
  • (APA 2541)
  • v. 2.
  • Watana Dam excavation & fills.
  • (APA 2542)
  • v. 3.
  • Watana Dam underground excavation.
  • (APA 2543)
  • v. 4.
  • Watana Dam concrete.
  • (APA 2544)
  • v. 5.
  • Watana Dam camp estimate.
  • (APA 2545).