Feasibility level estimate.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Feasibility level estimate Susitna Project. Feasibility level estimate |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | APA 2541 APA 2542 APA 2543 APA 2544 APA 2545 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2541-2545. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- v. 1.
- Watana.
- (APA 2541)
- v. 2.
- Watana Dam excavation & fills.
- (APA 2542)
- v. 3.
- Watana Dam underground excavation.
- (APA 2543)
- v. 4.
- Watana Dam concrete.
- (APA 2544)
- v. 5.
- Watana Dam camp estimate.
- (APA 2545).