Book S. Susitna HEP - P5700 59/79, estimate revisions, feasibility study to first draft - FERC applic.

A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet'); handwritten notes, table, calculations, and drawings; three graphs; and printed pages (from other reports) with handwritten changes. The sheets are from Acres American Incorporated and reg...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book S. Susitna Susitna Hydroelectric Project - P 5700 59/79, estimate revisions, feasibility study to first draft - F.E.R.C. application

Susitna HEP - P5700 59/79, estimate revisions, feasibility study to first draft - FERC applic.

Title on vertical label on title page: Backup Book S. Susitna HEP - estimate revisions

Title on table of contents page (page 2): Unit prices - backup calculations, estimate revisions, feasibility study to first draft F.E.R.C. application

(S). Unit prices - backup calculations, estimate revisions, feasibility study to first draft F.E.R.C. application
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 259
Series:Document (Susitna Hydroelectric Project) ; no. 259.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03463nam a2200553Ia 4500
001 2038590
003 SIRSI
005 20140523011044.0
007 ta
007 cr bn||||a||||
008 140523s1982 nyua tc 000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)880437980 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 259 
088 |a APA 259 
049 |a RLAA 
245 0 0 |a Book S.  |p Susitna HEP - P5700 59/79, estimate revisions, feasibility study to first draft - FERC applic. 
246 3 |a Book S.  |p Susitna Susitna Hydroelectric Project - P 5700 59/79, estimate revisions, feasibility study to first draft - F.E.R.C. application 
246 3 0 |a Susitna HEP - P5700 59/79, estimate revisions, feasibility study to first draft - FERC applic. 
246 1 |i Title on vertical label on title page:  |a Backup Book S.  |p Susitna HEP - estimate revisions 
246 1 |i Title on table of contents page (page 2):  |a Unit prices - backup calculations, estimate revisions, feasibility study to first draft F.E.R.C. application 
246 3 |a (S).  |p Unit prices - backup calculations, estimate revisions, feasibility study to first draft F.E.R.C. application 
260 |a [Buffalo, N.Y.? :  |b Acres American Incorporated,  |c 1982] 
300 |a 106 p. :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 259 
500 |a Handwritten at head of title on title page: Task 9 - Group 2 [i.e. 12?]. 
500 |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. 
500 |a At head of title on table of contents page: (S). 
500 |a Series statement from label on cover. 
500 |a Some page numbers are skipped (possibly blank pages that were not reproduced). Some pages are inserted without page numbers (for example, four pages between p. 26 and 27). Total number of pages is 106 matching the final page number. 
500 |a The pages are dated between February and November 1982. 
510 3 |a Assigned APA Document no. 259 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet'); handwritten notes, table, calculations, and drawings; three graphs; and printed pages (from other reports) with handwritten changes. The sheets are from Acres American Incorporated and regard changes to estimated costs of the proposed Susitna Hydroelectric Project. 
505 0 |a Estimate price change -- Manday calculations -- Watana/Devil Canyon cash flow -- Access road changes -- Additional rail head facilities. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 259. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/2/APA259.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00259