Unit costs - backup calculations, manpower costs/cash flows.
A collection of worksheets (called 'Calculations'), graphs, and a few typed tables from Acres American Incorporated regarding estimated labor costs for constructing the Devil Canyon Dam and Watana Dam in the Susitna Hydroelectric Project.
Saved in:
Alternate Title: | Book M. Unit costs - backup calculations, manpower costs/cash flows. (M). Unit costs - backup calculations, manpower costs/cash flows |
---|---|
Corporate Contributor(s): | Acres American Incorporated. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 110 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 110. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02436cam a2200505Ia 4500 | ||
---|---|---|---|
001 | 2038587 | ||
003 | SIRSI | ||
005 | 20140523011044.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140522s1982 nyuad t 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)880400594 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 110 | |
088 | |a APA 110 | ||
049 | |a RLAA | ||
130 | 0 | |a Book M. |p Unit costs - backup calculations, manpower costs/cash flows. | |
245 | 1 | 0 | |a Unit costs - backup calculations, manpower costs/cash flows. |
246 | 3 | |a (M). |p Unit costs - backup calculations, manpower costs/cash flows | |
260 | |a [Buffalo, N.Y.? : |b Acres American Incorporated, |c 1982] | ||
300 | |a 97 p. : |b ill., charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 110 | |
500 | |a At head of title: (M). | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Series statement from label on title page (numbered page 1). | ||
500 | |a Sheets are dated 1982. | ||
510 | 3 | |a Assigned APA Document no. 110 in the Susitna Hydroelectric Project document index. | |
500 | |a Cataloging based on copy lacking page 49. Cover and real title page missing? | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A collection of worksheets (called 'Calculations'), graphs, and a few typed tables from Acres American Incorporated regarding estimated labor costs for constructing the Devil Canyon Dam and Watana Dam in the Susitna Hydroelectric Project. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Labor costs |z Alaska |z Susitna River Region. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 110. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA110.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00110 |