Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials.

A collection of hand-completed worksheets (called 'Calculations') from Acres American Incorporated regarding construction of the Devil Canyon Dam, part of the proposed Susitna Hydroelectric Project. (Pages 26-27 (or J25-J26) cover the Watana Dam). Estimates are given for labor, material, a...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book J. Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials.

(J). Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 107
Series:Document (Susitna Hydroelectric Project) ; no. 107.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02861cam a2200517Ia 4500
001 2038586
003 SIRSI
005 20140523011043.0
007 ta
007 cr bn||||a||||
008 140522s1982 nyua t 000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)880383215 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 107 
088 |a APA 107 
049 |a RLAA 
130 0 |a Book J.  |p Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials. 
245 1 0 |a Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials. 
246 3 |a (J).  |p Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials 
260 |a [Buffalo, N.Y.? :  |b Acres American Incorporated,  |c 1982] 
300 |a 28 [i.e. 25] p. :  |b 2 ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 107 
500 |a Title from on table of contents page (page numbered 1). 
500 |a At head of title: (J). 
500 |a Series statement from label on table of contents page. 
500 |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. 
510 3 |a Assigned APA Document no. 107 in the Susitna Hydroelectric Project document index. 
500 |a Pages are numbered by hand on the bottom through 28 and on top through J27. Neither numbering is an accurate count of the pages. Total number of pages is 25. 
530 |a Available also in electronic format on the Internet. 
520 |a A collection of hand-completed worksheets (called 'Calculations') from Acres American Incorporated regarding construction of the Devil Canyon Dam, part of the proposed Susitna Hydroelectric Project. (Pages 26-27 (or J25-J26) cover the Watana Dam). Estimates are given for labor, material, and equipment for the saddle dam, joint grouting, dewatering, dumping production rates of principal operations, and penstock contact grouting. 
505 0 |a Saddle dam -- Joint grouting -- Misc. costs. 
610 2 0 |a Devil Canyon Project. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 107. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/1/APA107.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00107