Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials.

A collection of hand-completed worksheets (called 'Calculations') from Acres American Incorporated regarding construction of the Devil Canyon Dam, part of the proposed Susitna Hydroelectric Project. (Pages 26-27 (or J25-J26) cover the Watana Dam). Estimates are given for labor, material, a...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book J. Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials.

(J). Unit prices - backup calculations, Devil Canyon - unit costs, labor, equipment, materials
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 107
Series:Document (Susitna Hydroelectric Project) ; no. 107.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A collection of hand-completed worksheets (called 'Calculations') from Acres American Incorporated regarding construction of the Devil Canyon Dam, part of the proposed Susitna Hydroelectric Project. (Pages 26-27 (or J25-J26) cover the Watana Dam). Estimates are given for labor, material, and equipment for the saddle dam, joint grouting, dewatering, dumping production rates of principal operations, and penstock contact grouting.
Physical Description:28 [i.e. 25] p. : 2 ill. ; 28 cm.
Notes:Title from on table of contents page (page numbered 1).

At head of title: (J).

Series statement from label on table of contents page.

This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc.

Pages are numbered by hand on the bottom through 28 and on top through J27. Neither numbering is an accurate count of the pages. Total number of pages is 25.