Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : hourly rental rate details, equipment breakdown costs.
A collection of worksheets (eight typed tables and forty-four hand-completed sheets called 'Calculations') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. The sheets cover rock excavation, overburden removal, impervious till, borrow area dr...
Saved in:
Alternate Title: | Book I. Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs. (I). Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : hourly rental rate details, equipment breakdown costs |
---|---|
Corporate Contributor(s): | Acres American Incorporated. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 109 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 109. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02715cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 2038585 | ||
003 | SIRSI | ||
005 | 20140523011043.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140522s1982 nyu t 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)880381510 | ||
050 | 4 | |a TK1425.S8 |b A23 no. 109 | |
088 | |a APA 109 | ||
049 | |a RLAA | ||
130 | 0 | |a Book I. |p Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs. | |
245 | 1 | 0 | |a Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : |b hourly rental rate details, equipment breakdown costs. |
246 | 3 | |a (I). |p Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : |b hourly rental rate details, equipment breakdown costs | |
260 | |a [Buffalo, N.Y.? : |b Acres American Incorporated, |c 1982] | ||
300 | |a 54 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 109 | |
500 | |a At head of title: (I). | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Series statement from label on cover. | ||
520 | |a A collection of worksheets (eight typed tables and forty-four hand-completed sheets called 'Calculations') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. The sheets cover rock excavation, overburden removal, impervious till, borrow area drainage ditches and soil removal, construction roads, protective layer, surface preparation, spillway construction, gravel, concrete, cofferdams, and slope protection. | ||
510 | 3 | |a Assigned APA Document no. 109 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
500 | |a Cataloging based on copy lacking page 10 (perhaps a blank section divider?). | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 109. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA109.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00109 |