Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : hourly rental rate details, equipment breakdown costs.

A collection of worksheets (eight typed tables and forty-four hand-completed sheets called 'Calculations') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. The sheets cover rock excavation, overburden removal, impervious till, borrow area dr...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book I. Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs.

(I). Unit prices - backup calculations, Watana/Devil Canyon, breakdown on equipment costs/unit costs : hourly rental rate details, equipment breakdown costs
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 109
Series:Document (Susitna Hydroelectric Project) ; no. 109.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A collection of worksheets (eight typed tables and forty-four hand-completed sheets called 'Calculations') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. The sheets cover rock excavation, overburden removal, impervious till, borrow area drainage ditches and soil removal, construction roads, protective layer, surface preparation, spillway construction, gravel, concrete, cofferdams, and slope protection.
Physical Description:54 p. ; 28 cm.
Notes:At head of title: (I).

This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc.

Series statement from label on cover.

Cataloging based on copy lacking page 10 (perhaps a blank section divider?).