Hi-volume air monitoring program. Initial monitoring and quality assurance report /

Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to m...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Hi-volume air monitoring program. Initial monitoring and quality assurance report
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1695
Series:Document (Susitna Hydroelectric Project) ; no. 1695.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to measure baseline values of total suspended particulates (TSP), as such particulates caused by natural windblown dust is the only significant air contaminant at the site. Two sites are monitored: the proposed Watana campsite and another site along the Susitna River over three miles away. This report is the first of three reports written for this program being submitted to ADEC.
Physical Description:60 p. in various pagings : ill., maps, forms ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"June 1984."

"Susitna File no. 4.8.2."

"Federal Energy Regulatory Commission. Project No. 7114"--Cover.
Report Type:Final report.
Bibliography:Includes bibliographical references.