Aquatic resources study within the access alignment, transmission alignment, and construction area, Study plan Section 9.13, Initial Study Report /
Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, transmission lines, airports, and construction sites). The objectives of this study are to characterize the aquatic habitats and fish assemblages at potentia...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 9.13, Aquatic resources study within the access alignment, transmission alignment, and construction area. Draft. Initial Study Report. Aquatic resources study within the access alignment, transmission alignment, and construction area (9.13) |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. R2 Resource Consultants. Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 207 |
Edition: | Draft. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 207. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03550nam a2200529Ia 4500 | ||
---|---|---|---|
001 | 2032675 | ||
003 | SIRSI | ||
005 | 20140402082903.0 | ||
007 | cr cn||||a|||| | ||
008 | 140331s2014 akuab bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)875205529 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 207 sec. 9.13 | |
088 | |a SuWa 207 | ||
049 | |a RLAA | ||
130 | 0 | |a Initial Study Report. |n Study plan Section 9.13, |p Aquatic resources study within the access alignment, transmission alignment, and construction area. |s Draft. | |
245 | 1 | 0 | |a Aquatic resources study within the access alignment, transmission alignment, and construction area, Study plan Section 9.13, Initial Study Report / |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. |
246 | 1 | 7 | |a Initial Study Report. |p Aquatic resources study within the access alignment, transmission alignment, and construction area (9.13) |
250 | |a Draft. | ||
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2014] | ||
300 | |a iv, 27 p. : |b col. ill., col. maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207 | |
500 | |a "February 2014." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 207. | ||
513 | |a Draft Initial Study Report. | ||
510 | 3 | |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, transmission lines, airports, and construction sites). The objectives of this study are to characterize the aquatic habitats and fish assemblages at potential stream crossings along proposed access road and transmission line alignments and to describe aquatic habitats and species present within the construction area for the dam and related hydropower facilities. The study area includes lakes and streams within a 200-meter (650-foot) buffer zone of such infrastructure in the Susitna River and Tanana River basins. This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued February 1, 2013. | ||
504 | |a Includes bibliographical references (p. 6-7). | ||
650 | 0 | |a Freshwater habitats |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Fishes |x Effect of habitat modification on |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River Region. | |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a R2 Resource Consultants. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec9-13.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html |3 List of all draft Initial Study Reports. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 10 | ||
098 | |a SuWa 00207 |