Riparian instream flow study, Study plan Section 8.6, Initial Study Report /

Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sedimen...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.6, Riparian instream flow study, Study plan Section 8.6. Draft.

Initial Study Report. Riparian instream flow study (8.6)
Corporate Contributor(s):Alaska Energy Authority.

R2 Resource Consultants.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 207
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 207.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03136cam a2200529Ia 4500
001 2032672
003 SIRSI
005 20140402082902.0
007 cr cn||||a||||
008 140331s2014 akuabd bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)875203223 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 207 sec. 8.6 
088 |a SuWa 207 
049 |a RLAA 
130 0 |a Initial Study Report.  |n Study plan Section 8.6,  |p Riparian instream flow study, Study plan Section 8.6.  |s Draft. 
245 1 0 |a Riparian instream flow study, Study plan Section 8.6, Initial Study Report /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants. 
246 1 7 |a Initial Study Report.  |p Riparian instream flow study (8.6) 
250 |a Draft. 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a xii, 124, 7 p. :  |b col. ill., col. maps, col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207 
500 |a "February 2014." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 207. 
513 |a Draft Initial Study Report. 
510 3 |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. 
530 |a Available also in electronic format on the Internet. 
650 0 |a Instream flow  |x Research  |z Alaska  |z Susitna River. 
520 |a Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sediment, and ice process regimes. This draft document reports on Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued April 1, 2013 and in the 'Riparian instream flow, groundwater, and riparian vegetation studies FERC determination response technical memorandum filed July 1. 
504 |a Includes bibliographical references (p. 41-46). 
650 0 |a Riparian ecology  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
710 2 |a Alaska Energy Authority. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec8-6.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
710 2 |a R2 Resource Consultants. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207. 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html  |3 List of all draft Initial Study Reports.  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 10 
098 |a SuWa 00207