Information package, October 6-8, 1981 /

This report contains the information package for the third External Review Panel Meeting. By comparison, APA Documents 2359 contains the full proceedings of that meeting without most of the content provided here.

Saved in:
Bibliographic Details
Alternate Title:External Review Board Meeting #3, information package, October 6-8, 1981

Susitna Hydroelectric Project. External Review Board Meeting #3, information package, October 6-8, 1981
Corporate Author: Susitna Hydroelectric Project. External Review Panel. Meeting (3rd : 1981 : Buffalo, N.Y.)
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 1380
Series:Document (Susitna Hydroelectric Project) ; no. 1380.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03128cam a2200541Ia 4500
001 2023720
003 SIRSI
005 20140317093509.0
007 cr bn||||a||||
008 140310s1981 akuade s100 0 eng d
035 |a (OCoLC)872128975 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1380 
088 |a APA 1380 
110 2 |a Susitna Hydroelectric Project.  |b External Review Panel.  |b Meeting  |n (3rd :  |d 1981 :  |c Buffalo, N.Y.) 
245 1 0 |a Information package, October 6-8, 1981 /  |c External Review Board Meeting #3 ; prepared by Acres American Incorporated. 
246 3 |a External Review Board Meeting #3, information package, October 6-8, 1981 
246 3 |a Susitna Hydroelectric Project.  |p External Review Board Meeting #3, information package, October 6-8, 1981 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1981] 
300 |a [256] p. :  |b ill., charts, plans ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cover title; title page missing? 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a The third meeting of the Susitna Hydroelectric Project External Review Panel is called "Board" in this document except in the first paper. 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 1380 in the Susitna Hydroelectric Project document index. 
500 |a Includes a 10-page draft version (with identical text) of the 9-page final report: Susitna Hydroelectric Project External Review Panel report no. 3. 
530 |a Available also in electronic format on the Internet. 
520 |a This report contains the information package for the third External Review Panel Meeting. By comparison, APA Documents 2359 contains the full proceedings of that meeting without most of the content provided here. 
505 0 |a Susitna Hydroelectric Project External Review Panel report no. 3 -- Project status report, September 1981 -- Support material to Task 3 : hydrology -- Support material to Task 4 : seismic studies -- Support material to Task 5 : geotechnical studies -- Support material to Task 6 : design development -- Meeting agenda. 
610 2 0 |a Susitna Hydroelectric Project  |v Congresses. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |v Congresses. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
740 0 2 |a Susitna Hydroelectric Project External Review Panel report no. 3. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1380. 
043 |a n-us-ak 
596 |a 9 10 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 1380 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1380.pdf  |z Size: 37 MB.  |z ARLIS Document Server 
901 |a 3755  |c orig 
098 |a APA 01380