Planning memorandum. Subtask 8.02, Preliminary transmission system analysis.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Subtask 8.02, Preliminary transmission system analysis Subtask 8.02. Preliminary transmission system analysis Preliminary transmission system analysis |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | [Acres American Incorporated], |
Report Numbers: | APA 1346 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1346. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | [155] p. : ill. ; 28 cm. |
---|---|
Notes: | Issued by Acres American Incorporated in 1981 according to the Susitna Hydroelectric Project document index. At head of title: Susitna Hydroelectric Project. This plan of study was undertaken for Alaska Power Authority by Acres American Incorporated to present the results of the preliminary analysis of the electrical transmission system for the Susitna Hydroelectric Project through June 15, 1981. |