Subtask 11.01, Project overview, project manual.

This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 11.01, Project overview, project manual

Project overview, project manual
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Acres American Incorporated,
Report Numbers:APA 1366
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1366.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02451cam a2200469Ia 4500
001 2018549
003 SIRSI
005 20140214024151.0
007 cr bn||||a||||
008 140214s1980 mdu ft 000 0 eng d
035 |a (OCoLC)870549825 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1366 
088 |a APA 1366 
245 0 0 |a Subtask 11.01,  |p Project overview, project manual. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Subtask 11.01,  |p Project overview, project manual 
246 3 0 |a Project overview, project manual 
250 |a Final draft. 
260 |a Columbia, Md. :  |b Acres American Incorporated,  |c [1980] 
300 |a [125] p. :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a Letter of transmittal dated November 17, 1980. 
510 3 |a Assigned APA Document no. 1366 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
505 0 |a Introduction and purpose -- An overview of the project overview -- Procedures -- Outline and file index -- Chapter work plans -- Duties of key personnel -- Consolidated budet and schedule. 
520 |a This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned compilation of material on technical, commercial, economic, financial, contractual, and environmental aspects. 
610 2 0 |a Susitna Hydroelectric Project  |x Research  |x Methodology. 
710 2 |a Acres American Incorporated. 
650 0 |a Technical writing  |v Handbooks, manuals, etc. 
650 0 |a Dams  |x Research  |z Alaska  |z Susitna River  |x Methodology  |v Handbooks, manuals, etc. 
650 0 |a Hydroelectric power plants  |x Research  |z Alaska  |z Susitna River  |x Methodology  |v Handbooks, manuals, etc. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1366. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1366.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01366