Subtask 11.01, Project overview, project manual.
This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 11.01, Project overview, project manual Project overview, project manual |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1366 |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1366. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02451cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 2018549 | ||
003 | SIRSI | ||
005 | 20140214024151.0 | ||
007 | cr bn||||a|||| | ||
008 | 140214s1980 mdu ft 000 0 eng d | ||
035 | |a (OCoLC)870549825 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1366 | |
088 | |a APA 1366 | ||
245 | 0 | 0 | |a Subtask 11.01, |p Project overview, project manual. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Subtask 11.01, |p Project overview, project manual | |
246 | 3 | 0 | |a Project overview, project manual |
250 | |a Final draft. | ||
260 | |a Columbia, Md. : |b Acres American Incorporated, |c [1980] | ||
300 | |a [125] p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a Letter of transmittal dated November 17, 1980. | ||
510 | 3 | |a Assigned APA Document no. 1366 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a Introduction and purpose -- An overview of the project overview -- Procedures -- Outline and file index -- Chapter work plans -- Duties of key personnel -- Consolidated budet and schedule. | |
520 | |a This manual has been prepared by Acres American Incorporated on behalf of Alaska Power Authority for proceeding with Subtask 11.01 of the Susitna Hydroelectric feasibility study in order to complete that subtask successfully. This manual provides a comprehensive work plan for creating a well planned compilation of material on technical, commercial, economic, financial, contractual, and environmental aspects. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Research |x Methodology. |
710 | 2 | |a Acres American Incorporated. | |
650 | 0 | |a Technical writing |v Handbooks, manuals, etc. | |
650 | 0 | |a Dams |x Research |z Alaska |z Susitna River |x Methodology |v Handbooks, manuals, etc. | |
650 | 0 | |a Hydroelectric power plants |x Research |z Alaska |z Susitna River |x Methodology |v Handbooks, manuals, etc. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1366. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1366.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01366 |