Task 6, 1981 upper limit capital cost estimate /
Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -- Watana/Devil Canyon Project cost estimates -- Transmission line cost estimates -- Conclusion.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Task 6, 1981 upper limit capital cost estimate Alaska Power Authority, Susitna Hydroelectric Project. Task 6, 1981 upper limit capital cost estimate Title on table of contents page: 1981 upper limit capital cost estimate |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Acres American Incorporated. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 333 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 333. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02296cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 2018516 | ||
003 | SIRSI | ||
005 | 20140424024738.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140214s1981 akua t s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)870539811 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 333 | |
088 | |a APA 333 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Task 6, 1981 upper limit capital cost estimate / |c Acres American Incorporated. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |n Task 6, |p 1981 upper limit capital cost estimate |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 6, |p 1981 upper limit capital cost estimate | |
246 | 1 | |i Title on table of contents page: |a 1981 upper limit capital cost estimate | |
260 | |a [Anchorage] : |b Alaska Power Authority, |c [1981] | ||
300 | |a [40] p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 333 | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 333 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -- Watana/Devil Canyon Project cost estimates -- Transmission line cost estimates -- Conclusion. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Costs, Industrial |z Alaska |z Susitna River Valley. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 333. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/3/APA333.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00333 |