Task 6, 1981 upper limit capital cost estimate /

Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -- Watana/Devil Canyon Project cost estimates -- Transmission line cost estimates -- Conclusion.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 6, 1981 upper limit capital cost estimate

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, 1981 upper limit capital cost estimate

Title on table of contents page: 1981 upper limit capital cost estimate
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Acres American Incorporated.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 333
Series:Document (Susitna Hydroelectric Project) ; no. 333.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Introduction. Study objective ; Report contents -- Summary. Watana/Devil Canyon cost estimates ; Transmission line cost estimates ; Conclusions -- Watana/Devil Canyon Project cost estimates -- Transmission line cost estimates -- Conclusion.
Physical Description:[40] p. : ill. ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

Series statement from label on cover.