Design transmittal. Subtask 6.36, Generation planning parameters.
This report is an analysis of of costs, size, and time of power production in Alaska as part of planning of the Susitna Hydroelectric Project. Basic assumptions and the planning methodology are presented for the Susitna dam project and to its alternatives, such as steam plants, oil- and gas-fired ga...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Design trasmittal. Subtask 6.36, Generation planning parameters Subtask 6.36. Generation planning parameters Generation planning parameters |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1288 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1288. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02250cam a2200481Ia 4500 | ||
---|---|---|---|
001 | 2018512 | ||
003 | SIRSI | ||
005 | 20140530043835.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140214s1981 nyu t 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)870539751 | ||
043 | |a n-us-ak | ||
045 | 2 | |b d1980 |b d2010 | |
050 | 4 | |a TK1425.S8 |b A23 no. 1288 | |
088 | |a APA 1288 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Design transmittal. |n Subtask 6.36, |p Generation planning parameters. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Design trasmittal. |n Subtask 6.36, |p Generation planning parameters | |
246 | 3 | 0 | |a Subtask 6.36. |p Generation planning parameters |
246 | 3 | 0 | |a Generation planning parameters |
260 | |a Buffalo, N.Y. : |b Acres American Incorporated, |c [1981] | ||
300 | |a 16 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "January 1981." | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
510 | 3 | |a Assigned APA Document no. 1288 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This report is an analysis of of costs, size, and time of power production in Alaska as part of planning of the Susitna Hydroelectric Project. Basic assumptions and the planning methodology are presented for the Susitna dam project and to its alternatives, such as steam plants, oil- and gas-fired gas turbine plants, and diesel plants. Load and energy forecasts for the Alaska Railbelt region are made for the period 1980 to 2010. | ||
650 | 0 | |a Electric power-plants |x Estimates |z Alaska. | |
650 | 0 | |a Electric power |z Alaska |x Forecasting. | |
650 | 0 | |a Electric power production |z Alaska |x Planning. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1288. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1288.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 01288 |