Design transmittal. Subtask 6.36, Generation planning parameters.

This report is an analysis of of costs, size, and time of power production in Alaska as part of planning of the Susitna Hydroelectric Project. Basic assumptions and the planning methodology are presented for the Susitna dam project and to its alternatives, such as steam plants, oil- and gas-fired ga...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Design trasmittal. Subtask 6.36, Generation planning parameters

Subtask 6.36. Generation planning parameters

Generation planning parameters
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:Acres American Incorporated,
Report Numbers:APA 1288
Series:Document (Susitna Hydroelectric Project) ; no. 1288.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report is an analysis of of costs, size, and time of power production in Alaska as part of planning of the Susitna Hydroelectric Project. Basic assumptions and the planning methodology are presented for the Susitna dam project and to its alternatives, such as steam plants, oil- and gas-fired gas turbine plants, and diesel plants. Load and energy forecasts for the Alaska Railbelt region are made for the period 1980 to 2010.
Physical Description:16 p. ; 28 cm.
Notes:"January 1981."

At head of title: Alaska Power Authority, Susitna Hydroelectric Project.