Subtask 6.01 closeout report, design development, review of previous studies and reports /

A review of previous reports on the Susitna Hydroelectric Project covering studies made by the U.S. Bureau of Reclamation (1953 and 1960), Alaska Power Administration (1974), Kaiser Engineers (1974), and U.S. Corps of Engineers (1975 and 1979); design parameters (civil, hydrology, geotechnical, mech...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 6.01, Closeout report, design development, review of previous studies and reports

Subtask 6.01 closeout report, final December 80
Main Author: Curtis, R. H.
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Acres American Incorporated,
Report Numbers:APA 1275
Series:Document (Susitna Hydroelectric Project) ; no. 1275.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A review of previous reports on the Susitna Hydroelectric Project covering studies made by the U.S. Bureau of Reclamation (1953 and 1960), Alaska Power Administration (1974), Kaiser Engineers (1974), and U.S. Corps of Engineers (1975 and 1979); design parameters (civil, hydrology, geotechnical, mechanical, hydropower, environmental, generation planning); and construction costs.
Physical Description:[v], 28, [27], 40 p. : ill. ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"Date of issue 11-21-80"--Transmittal data sheet.

"File no. P5700.15.6"--Transmittal data sheet.
Report Type:Final draft.
Bibliography:Includes bibliographical references (p. [29]).