Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan /

The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.
Physical Description:18 p. : 2 col. maps ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Report Type:Final study plan.
Bibliography:Includes bibliographical references (p. 9.16-12 to 9.16-13).