Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan /
The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.
Saved in:
Alternate Title: | Final study plan. Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014. |
---|---|
Physical Description: | 18 p. : 2 col. maps ; 28 cm. |
Notes: | "July 2013." "Susitna-Watana Hydroelectric Project (FERC No. 14241)." ARLIS assigned report number: SuWa 200. |
Report Type: | Final study plan. |
Bibliography: | Includes bibliographical references (p. 9.16-12 to 9.16-13). |