Susitna River productivity study implementation plan /

Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of this study is to co...

Full description

Saved in:
Bibliographic Details
Alternate Title:Productivity study implementation plan
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The chief goal of this study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g. temperature, substrate, water quality) and benthic macroinvertebrate and algal communities in the middle and lower Susitna River. This document describes research methods and sampling protocols.
Physical Description:147 p. in various pagings : ill. (some col.), maps (some col.), forms ; 28 cm.
Notes:"March 1, 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.

Section 9.8a of the Final study plan.
Report Type:Final study plan.
Bibliography:Includes bibliographical references (p. 51-63).