Fish and aquatic resources, Study plan Section 9, Introduction, Final study plan /
The potential effects of the Susitna-Watana Hydroelectric Project on fish and aquatic resources will need to be carefully evaluated as part of the licensing process. This study plan describes the Susitna-Watana Fish and Aquatic Resources Study that will be conducted to characterize and evaluate thes...
Saved in:
Alternate Title: | Final study plan. Final study plan. Fish and aquatic resources introduction |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02899cam a2200505Ia 4500 | ||
---|---|---|---|
001 | 2018353 | ||
003 | SIRSI | ||
005 | 20140212011153.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 140212s2013 aku s000 0 eng d | ||
035 | |a (OCoLC)870339500 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 200 sec. 9 | |
088 | |a SuWa 200 | ||
110 | 2 | |a Alaska Energy Authority. | |
240 | 1 | 0 | |a Final study plan. |n Study plan Section 9, |p Introduction, fish and aquatic resources |
245 | 1 | 0 | |a Fish and aquatic resources, Study plan Section 9, Introduction, Final study plan / |c Alaska Energy Authority. |
246 | 1 | 7 | |a Final study plan. |p Fish and aquatic resources introduction |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a 5 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200 | |
500 | |a "July 2013." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 200. | ||
513 | |a Final study plan. | ||
510 | 3 | |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The potential effects of the Susitna-Watana Hydroelectric Project on fish and aquatic resources will need to be carefully evaluated as part of the licensing process. This study plan describes the Susitna-Watana Fish and Aquatic Resources Study that will be conducted to characterize and evaluate these effects. The overall objectives of this study are: (1) to provide a baseline characterization of existing resources, and (2) to collect information that will support the evaluation of potential resource impacts of the proposed Project that were identified during development of the Pre-Application Document, public comment, and Federal Energy Regulatory Commission scoping for the License Application. | ||
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Fishes |x Effect of dams on |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Aquatic resources |x Research |z Alaska |z Susitna River. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec9.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html |3 List of related Final Study Plans. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SuWa 00200 |