Fish and aquatic resources, Study plan Section 9, Introduction, Final study plan /

The potential effects of the Susitna-Watana Hydroelectric Project on fish and aquatic resources will need to be carefully evaluated as part of the licensing process. This study plan describes the Susitna-Watana Fish and Aquatic Resources Study that will be conducted to characterize and evaluate thes...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Fish and aquatic resources introduction
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The potential effects of the Susitna-Watana Hydroelectric Project on fish and aquatic resources will need to be carefully evaluated as part of the licensing process. This study plan describes the Susitna-Watana Fish and Aquatic Resources Study that will be conducted to characterize and evaluate these effects. The overall objectives of this study are: (1) to provide a baseline characterization of existing resources, and (2) to collect information that will support the evaluation of potential resource impacts of the proposed Project that were identified during development of the Pre-Application Document, public comment, and Federal Energy Regulatory Commission scoping for the License Application.
Physical Description:5 p. ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Report Type:Final study plan.