Aesthetic resources study, Study plan Section 12.6, Final study plan /
The objectives for this study are to inventory and document baseline aesthetic (e.g. visual, auditory) conditions within the study area and evaluate the potential effects to aesthetic resources that may result from construction and operation of the proposed Susitna-Watana Hydroelectric Project. The...
Saved in:
Alternate Title: | Final study plan. Final study plan. Aesthetic resources study 12.6 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03089cam a2200517Ia 4500 | ||
---|---|---|---|
001 | 2015789 | ||
003 | SIRSI | ||
005 | 20140130021510.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 140130s2013 akub b s000 0 eng d | ||
035 | |a (OCoLC)869486811 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 200 sec. 12.6 | |
088 | |a SuWa 200 | ||
110 | 2 | |a Alaska Energy Authority. | |
240 | 1 | 0 | |a Final study plan. |n Study plan Section 12.6, |p Aesthetic resources study |
245 | 1 | 0 | |a Aesthetic resources study, Study plan Section 12.6, Final study plan / |c Alaska Energy Authority. |
246 | 1 | 7 | |a Final study plan. |p Aesthetic resources study 12.6 |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a 19 p. : |b 1 col. map ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200 | |
500 | |a "July 2013." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 200. | ||
513 | |a Final study plan. | ||
510 | 3 | |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The objectives for this study are to inventory and document baseline aesthetic (e.g. visual, auditory) conditions within the study area and evaluate the potential effects to aesthetic resources that may result from construction and operation of the proposed Susitna-Watana Hydroelectric Project. The analysis will focus on assessing these potential effects and will help identify potential design and other mitigation options. The primary study area is defined as a 30-mile buffer zone surrounding Project components (dam, reservoir, transmission lines, access corridors, dam, and camp facilities, and borrow sites). A secondary study area will encompass a region far larger to include the Parks Highway (western boundary), the Denali Highway (northern boundary), the Richardson Highway (eastern boundary), and the Glenn Highway (southern boundary). | ||
504 | |a Includes bibliographical references (p. 12.6-10 to 12.6-11). | ||
650 | 0 | |a Landscape protection |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Light pollution |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Noise pollution |x Research |z Alaska |z Susitna River Region. | |
650 | 4 | |a Aesthetic resources |x Research |z Alaska |z Susitna River Region. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec12-6.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html |3 List of related Final Study Plans. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SuWa 00200 |