Invasive plant study, Study plan Section 11.9, Final study plan /

The overall goals of this study are to determine the current prevalence of invasive vascular plants in the Susitna-Watana Hydroelectric Project area and nearby disturbed areas and to assess the risk of the continued spread of invasive species as a result of Project development.

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Invasive plant study 11.9
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The overall goals of this study are to determine the current prevalence of invasive vascular plants in the Susitna-Watana Hydroelectric Project area and nearby disturbed areas and to assess the risk of the continued spread of invasive species as a result of Project development.
Physical Description:9 p. ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Report Type:Final study plan.
Bibliography:Includes bibliographical references (page "11.9-6").