Wetland mapping study in the upper and middle Susitna basin, Study plan Section 11.7, Final study plan /

The overall goal of the wetland mapping study is to prepare a baseline map of the existing wetland habitats in the upper and middle Susitna basin (upstream of the proposed Susitna-Watana Hydroelectric Project dam site). This mapping information eventually will be used to assess impacts to wetland re...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Wetland mapping study in the upper and middle Susitna basin 11.7
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The overall goal of the wetland mapping study is to prepare a baseline map of the existing wetland habitats in the upper and middle Susitna basin (upstream of the proposed Susitna-Watana Hydroelectric Project dam site). This mapping information eventually will be used to assess impacts to wetland resources from the proposed Project, and to develop protection, mitigation, and enhancement measures, as appropriate. The study area encompasses a 2-mile buffer zone around the planned access routes, transmission lines, dam, reservoir, and facilities, and includes the corridor north to the Denali Highway and to Cantwell.
Physical Description:16 p. : 1 col. map ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Report Type:Final study plan.
Bibliography:Includes bibliographical references (p. 11.7-11 to 11.7-12).