Geology and soils characterization study, Study plan Section 4.5, Final study plan /

The goals of this study are to conduct a geology and soils evaluation to define the existing geological conditions at the dam site, reservoir, and access and transmission corridors, and to develop design criteria to ensure that the proposed Susitna-Watana Hydroelectric Project facilities and structu...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Geology and soils study 4.5
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The goals of this study are to conduct a geology and soils evaluation to define the existing geological conditions at the dam site, reservoir, and access and transmission corridors, and to develop design criteria to ensure that the proposed Susitna-Watana Hydroelectric Project facilities and structures will be safe and adequate to fulfill their functions.
Physical Description:8 p. : 1 col. ill. ; 28 cm.
Notes:"July 2013."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 200.
Report Type:Final study plan.
Bibliography:Includes bibliographical references (page "4.5-7").