Access, construction and transmission aquatic and mitigation plan /

Saved in:
Bibliographic Details
Corporate Contributor(s):Woodward-Clyde Consultants.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.

Entrix, Inc.

Susitna Hydroelectric Project.
Publisher:Wood-Clyde Consultants : Entrix, Inc.,
Report Numbers:APA 2921 (draft)

SUS 513
Edition:[Draft].
Series:Draft mitigation report ; no. 1.
Document (Susitna Hydroelectric Project) ; no. 2921d.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:ix, 90 pages, [52] leaves : illustrations, maps ; 28 cm.
Notes:"May 1985."
Related Titles:Revised as: Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan. [Anchorage, Alaska] : Alaska Power Authority, [1985] Impact assessment and mitigation report ; no. 1 Document (Susitna Hydroelectric Project) ; no. 2921
Bibliography:Includes bibliographical references (pages 85-90).