Access, construction and transmission aquatic and mitigation plan /
Saved in:
Corporate Contributor(s): | Woodward-Clyde Consultants. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Entrix, Inc. Susitna Hydroelectric Project. |
---|---|
Publisher: | Wood-Clyde Consultants : Entrix, Inc., |
Report Numbers: | APA 2921 (draft) SUS 513 |
Edition: | [Draft]. |
Series: | Draft mitigation report ;
no. 1. Document (Susitna Hydroelectric Project) ; no. 2921d. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | ix, 90 pages, [52] leaves : illustrations, maps ; 28 cm. |
---|---|
Notes: | "May 1985." |
Related Titles: | Revised as: Access corridor, construction zone and transmission corridor fish impact assessment and mitigation plan. [Anchorage, Alaska] : Alaska Power Authority, [1985] Impact assessment and mitigation report ; no. 1 Document (Susitna Hydroelectric Project) ; no. 2921 |
Bibliography: | Includes bibliographical references (pages 85-90). |