Middle river fish mitigation plan /
Saved in:
Main Author: | |
---|---|
Additional Author(s): | Moulton, Lawrence L. Rundquist, L. A. |
Corporate Contributor(s): | Woodward-Clyde Consultants. Entrix, Inc. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Wood-Clyde Consultants : Entrix, Inc., |
Report Numbers: | APA 2923 (draft) SUS 515 |
Edition: | [Draft]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2923d. Draft mitigation report ; no. 3. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03140cam a2200661Ia 4500 | ||
---|---|---|---|
001 | 2014651 | ||
003 | SIRSI | ||
005 | 20160531094613.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140117s1985 akuabd bt 000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCF |d OCLCQ |d RLA | ||
035 | |a (OCoLC)868354543 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A68 no. 2923d | |
088 | |a APA 2923 (draft) | ||
088 | |a SUS 515 | ||
049 | |a RLAA | ||
100 | 1 | |a Crumley, S. C. | |
245 | 1 | 0 | |a Middle river fish mitigation plan / |c prepared by Wood-Clyde Consultants ; in association with Entrix, Inc. ; submitted to Harza-Ebasco Susitna Joint Venture ; for the Alaska Power Authority. |
250 | |a [Draft]. | ||
260 | |a Anchorage, Alaska : |b Wood-Clyde Consultants : |b Entrix, Inc., |c [1985] | ||
300 | |a ix, 148 pages : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Aquatic mitigation report series | |
490 | 1 | |a Draft mitigation report ; |v no. 3 | |
500 | |a At head of series: Susitna Hydroelectric Project. | ||
500 | |a Authors listed on page ii: S.C. Crumley, L.L. Moulton, and L.A. Rundquist. They finalized the report as employees of Entrix, Inc. | ||
500 | |a "June 1985." | ||
500 | |a The final version of this report was not released. | ||
504 | |a Includes bibliographical references (pages 93-95). | ||
510 | 3 | |a In the Susitna Hydroelectric Project document index, APA Document no. 2923 was unassigned and reserved for the (unpublished) final report. Alaska Resources Library and Information Services has assigned number "APA 2923 (draft)" (or "APA 2923d") to this draft version for the Susitna Hydroelectric Project collection. | |
510 | 3 | |a Assigned number SUS 515 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet. | ||
650 | 0 | |a Fishes |x Effect of dams on |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Dams |x Environmental aspects. |2 fast |0 (OCoLC)fst00887340 | |
650 | 7 | |a Fishes |x Effect of dams on. |2 fast |0 (OCoLC)fst00926428 | |
650 | 7 | |a Hydroelectric power plants |x Environmental aspects. |2 fast |0 (OCoLC)fst00964942 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
700 | 1 | |a Moulton, Lawrence L. | |
700 | 1 | |a Rundquist, L. A. | |
710 | 2 | |a Woodward-Clyde Consultants. | |
710 | 2 | |a Entrix, Inc. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2923d. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
830 | 0 | |a Draft mitigation report ; |v no. 3. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/29/APA2923d.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SUS 00515 | ||
098 | |a APA 02923 (draft) |