Appendix 1, Comment response table of FERC-filed comments /

A table of responses from AEA to comments from 27 organizations and a few individual persons on AEA's Proposed study plan submitted to FERC. Those organizations include state and federal agencies, Alaska Native corporations, and various advocacy groups.

Saved in:
Bibliographic Details
Alternate Title:Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241.

Appendix One, Comment response table of Federal Energy Regulatory Commission-filed comments

Comment response table of FERC-filed comments

At head of title: Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241

Revised study plan

Appendix 1, Alaska Energy Authority's (AEA) response to comments on the Proposed Study Plan (PSP) and interim draft Revised Study Plan (RSP) (letters filed with FERC November 1 through 14, 2012)

Alaska Energy Authority's (AEA) response to comments on the Proposed Study Plan (PSP) and interim draft Revised Study Plan (RSP) (letters filed with FERC November 1 through 14, 2012)
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 77
Series:Susitna-Watana Hydroelectric Project document ; no. 77.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:A table of responses from AEA to comments from 27 organizations and a few individual persons on AEA's Proposed study plan submitted to FERC. Those organizations include state and federal agencies, Alaska Native corporations, and various advocacy groups.
Physical Description:493 p. ; 28 cm.
Notes:"December 2012."

ARLIS assigned report number: SuWa 77.

Appendix to: Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 / Alaska Energy Authority. [Anchorage : Alaska Energy Authority, 2012]. -- (SuWa 76).
Report Type:Revised study plan.