Appendix 4, Consultation documentation for informal consultation, July-November 2012 /

Meeting notes to 29 technical workgroup meetings held between August 8 and November 2, 2012. Discussion covered AEA's Proposed study plan submitted to FERC. Includes an attendee list for each meeting.

Saved in:
Bibliographic Details
Alternate Title:Revised study , Susitna-Watana Hydroelectric Project, FERC No. 14241.

Consultation documentation for informal consultation, July-November 2012

Appendix 4, Informal consultation documentation, technical workgroup meeting notes

At head of title: Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241

Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241.
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 80
Series:Susitna-Watana Hydroelectric Project document ; no. 80.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:Meeting notes to 29 technical workgroup meetings held between August 8 and November 2, 2012. Discussion covered AEA's Proposed study plan submitted to FERC. Includes an attendee list for each meeting.
Physical Description:513 p. in various pagings : col. ill., col. maps ; 28 cm.
Notes:ARLIS assigned report number: SuWa 80.

Appendix to: Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 / Alaska Energy Authority. [Anchorage : Alaska Energy Authority, 2012]. -- (SuWa 76).
Report Type:Revised study plan.