Appendix 4, Consultation documentation for informal consultation, July-November 2012 /
Meeting notes to 29 technical workgroup meetings held between August 8 and November 2, 2012. Discussion covered AEA's Proposed study plan submitted to FERC. Includes an attendee list for each meeting.
Saved in:
Alternate Title: | Revised study , Susitna-Watana Hydroelectric Project, FERC No. 14241. Consultation documentation for informal consultation, July-November 2012 Appendix 4, Informal consultation documentation, technical workgroup meeting notes At head of title: Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 80 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 80. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Meeting notes to 29 technical workgroup meetings held between August 8 and November 2, 2012. Discussion covered AEA's Proposed study plan submitted to FERC. Includes an attendee list for each meeting. |
---|---|
Physical Description: | 513 p. in various pagings : col. ill., col. maps ; 28 cm. |
Notes: | ARLIS assigned report number: SuWa 80. Appendix to: Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 / Alaska Energy Authority. [Anchorage : Alaska Energy Authority, 2012]. -- (SuWa 76). |
Report Type: | Revised study plan. |