Revised study plan determination schedule.
A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the S...
Saved in:
Alternate Title: | Reference: Revised study plan determination schedule |
---|---|
Main Author: | |
Additional Author(s): | Dyok, Wayne, |
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Office of Energy Projects. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Report Numbers: | SuWa 86 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 86. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02992ctm a2200589Ia 4500 | ||
---|---|---|---|
001 | 1979621 | ||
003 | SIRSI | ||
005 | 20140619082406.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 131022e20121231xx 000 i eng d | ||
040 | |a RLA |c RLA |d RLA |d OCLCO |d RLA | ||
035 | |a (OCoLC)861236505 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 86 | |
088 | |a SuWa 86 | ||
049 | |a RLAA | ||
100 | 1 | |a Wright, Jeff C., |e author. | |
245 | 1 | 0 | |a Revised study plan determination schedule. |
246 | 3 | |a Reference: Revised study plan determination schedule | |
260 | |c 2012 December 31. | ||
300 | |a 4 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 86 | |
500 | |a Title from caption. | ||
500 | |a At head of title: "Reference:". | ||
500 | |a "Project No. 14241-000 - Alaska, Susitna-Watana Hydroelectric Project, Alaska Energy Authority." | ||
500 | |a "December 31, 2012." | ||
500 | |a ARLIS assigned report number: SuWa 86. | ||
513 | |a Correspondence. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Correspondence. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff [C.] Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter lists study details for Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana Hydroelectric Project. | ||
505 | 0 | |a Letter -- attachment A. Revised study plan determination schedule for December 14, 2012, revised study plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9. | |
610 | 2 | 0 | |a Alaska Energy Authority. |t Revised study plan. |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Planning. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Planning. | |
655 | 0 | |a Government correspondence. | |
700 | 1 | |a Dyok, Wayne, |e addressee. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. |b Office of Energy Projects. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Alaska Energy Authority. | |
787 | 0 | |a Alaska Energy Authority. |t Revised study plan. |d [Anchorage : Alaska Energy Authority, 2012] |w (OCoLC)864637672 | |
787 | 0 | 8 | |i This letter has a response: |a Fisher-Goad, Sara. |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000. |d 2013 January 7 |k Susitna-Watana Hydroelectric Project document ; no. 87 |r SuWa 87 |w (OCoLC)860725219 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 86. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa86.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SuWa 00086 |