Watana transportation access analysis, Project no. 82002. Executive summary /
This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support o...
Saved in:
Alternate Title: | Watana transportation access study, June 2012 Title on Project's Document webpage: Cover letter and executive summary |
---|---|
Corporate Contributor(s): | Alaska. Department of Transportation and Public Facilities. Susitna-Watana Hydroelectric Project. HDR Alaska, Inc. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 89 |
Edition: | Draft. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 89. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support of construction. The intent is to provide a reconnaissance-level study based on engineering, scientific and environmental information. Additional information regarding environmental and other issues related to the routes will be developed later as part of the National Environmental Policy Act process. |
---|---|
Physical Description: | ix p. ; 28 cm. |
Notes: | Includes cover letter from Wayne Dyok, Project Manager, Susitna-Watana Hydroelectric Project. "June 2012." ARLIS assigned report number: SuWa 89. |
Report Type: | Alaska Department of Transportation access analysis. |