Watana transportation access analysis, Project no. 82002 /

This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support o...

Full description

Saved in:
Bibliographic Details
Alternate Title:Watana transportation access study, June 2012
Corporate Contributor(s):Alaska. Department of Transportation and Public Facilities.

HDR Alaska, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 90
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 90.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support of construction. The intent is to provide a reconnaissance-level study based on engineering, scientific and environmental information. Additional information regarding environmental and other issues related to the routes will be developed later as part of the National Environmental Policy Act process.
Physical Description:xvi, 108 p. : col. ill., col. maps ; 28 cm.
Notes:"June 2012."

ARLIS assigned report number: SuWa 90.
Report Type:Alaska Department of Transportation access analysis.
Bibliography:Includes bibliographical references (p. 104-108).