Cultural resources study /
In response to the planned construction of a dam on the Susitna River at River Mile 184, a cultural resources study was conducted in 2012 in order to inventory a sample of known cultural resources within the direct area of potential effect and to assess the time and effort involved with inventorying...
Saved in:
Additional Author(s): | Hays, Justin M. Gelvin-Reymiller, Carol. Bowers, Peter, 1952- Mobley, Charles M. Brelsford, Taylor. Bundtzen, Thomas K. |
---|---|
Corporate Contributor(s): | Northern Land Use Research, Inc. Charles M. Mobley & Associates. URS Corporation. Pacific Rim Geological Consulting, Inc. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 30 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 30. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Study Objectives
- Study areas
- Methods
- Results
- Discussion and conclusion
- appendix. Cultural resources assessment of 2012 borehole sites, for the Susitna-Watana Hydroelectric Project (August 2012).