Cultural resources study /
In response to the planned construction of a dam on the Susitna River at River Mile 184, a cultural resources study was conducted in 2012 in order to inventory a sample of known cultural resources within the direct area of potential effect and to assess the time and effort involved with inventorying...
Saved in:
Additional Author(s): | Hays, Justin M. Gelvin-Reymiller, Carol. Bowers, Peter, 1952- Mobley, Charles M. Brelsford, Taylor. Bundtzen, Thomas K. |
---|---|
Corporate Contributor(s): | Northern Land Use Research, Inc. Charles M. Mobley & Associates. URS Corporation. Pacific Rim Geological Consulting, Inc. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 30 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 30. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03525cam a2200625Ia 4500 | ||
---|---|---|---|
001 | 1977317 | ||
003 | SIRSI | ||
005 | 20131101045610.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 131008s2013 akuabd bt s000 0 eng d | ||
035 | |a (OCoLC)859608890 | ||
040 | |a RLA |c RLA |d RLA |d OCLCO |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S92 no. 30 | |
088 | |a SuWa 30 | ||
245 | 0 | 0 | |a Cultural resources study / |c prepared for Alaska Energy Authority ; prepared by Justin M. Hays, Carol Gelvin-Reymiller, and Peter M. Bowers, Northern Land Use Research, Inc. ; Charles M. Mobley, Charles M. Mobley and Associates ; Taylor Brelsford, URS Corp. ; Tom Bundtzen, Pacific Rim Geological Consulting, Inc. |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2013] | ||
300 | |a v, 23, 8 p. : |b col. ill., col. maps, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 30 | |
500 | |a At head of title: Susitna-Watana Hydroelectric Project (FERC No. 14241). | ||
500 | |a "February 2013." | ||
500 | |a ARLIS assigned report number: SuWa 30. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: 2012 environmental studies. | |
513 | |a 2012 environmental studies. | ||
513 | |a Final report. | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a In response to the planned construction of a dam on the Susitna River at River Mile 184, a cultural resources study was conducted in 2012 in order to inventory a sample of known cultural resources within the direct area of potential effect and to assess the time and effort involved with inventorying the total of known cultural resources. The known cultural sites within the area of potential effect include the dam impoundment area and several transportation corridors. Such sites are prehistoric, paleontological, historic and protohistoric. Modeling was done to aid in locating sites. Work planned for the 2013 and 2014 seasons is also described. | ||
650 | 0 | |a Archaeological surveying |z Alaska |z Susitna River Watershed. | |
505 | 0 | |a Introduction -- Study Objectives -- Study areas -- Methods -- Results -- Discussion and conclusion -- appendix. Cultural resources assessment of 2012 borehole sites, for the Susitna-Watana Hydroelectric Project (August 2012). | |
504 | |a Includes bibliographical references (p. 15-16). | ||
650 | 0 | |a Archaeological site location |z Alaska |z Susitna River Watershed. | |
651 | 0 | |a Susitna River Watershed (Alaska) |x Antiquities. | |
650 | 0 | |a Archaeological site location |z Alaska |x Computer simulation. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
700 | 1 | |a Hays, Justin M. | |
700 | 1 | |a Gelvin-Reymiller, Carol. | |
700 | 1 | |a Bowers, Peter, |d 1952- | |
700 | 1 | |a Mobley, Charles M. | |
700 | 1 | |a Brelsford, Taylor. | |
700 | 1 | |a Bundtzen, Thomas K. | |
710 | 2 | |a Northern Land Use Research, Inc. | |
710 | 2 | |a Charles M. Mobley & Associates. | |
710 | 2 | |a URS Corporation. | |
710 | 2 | |a Pacific Rim Geological Consulting, Inc. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Alaska Energy Authority. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 30. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa30.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00030 |