Susitna River productivity study implementation plan /
The overarching goal of this study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g., temperature, substrate, water quality) and benthic macroinvertebrate and algal communities in the middle and upper Susitna...
Saved in:
Alternate Title: | Attachment B, Final Susitna River productivity study implementation plan (March 2013) River productivity implementation plan |
---|---|
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. R2 Resource Consultants. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 18 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 18. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The overarching goal of this study is to collect baseline data to assist in evaluating the potential Project-induced changes in flow and effects on environmental factors (e.g., temperature, substrate, water quality) and benthic macroinvertebrate and algal communities in the middle and upper Susitna River. This document describes the research methods and protocols that will be used. |
---|---|
Physical Description: | v, 86, [44] p. , col. ill., col. maps, col. charts, forms ; 28 cm. |
Notes: | At head of title: Susitna-Watana Hydroelectric Project, (FERC No. 14241). "March 1, 2013." ARLIS assigned report number: SuWa 18. This document is an attachment to: Susitna-Watana Hydroelectric Project, FERC project no. 14241-000; submittal of information related to study plan determination (SuWa 16). |
Related Titles: | Attachment to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; submittal of information related to study plan determination. [Anchorage : Alaska Energy Authority, 2013] |
Bibliography: | Includes bibliographical references (p. 49-61). |