Introduction to an instream flow study plan for the proposed Susitna Hydroelectric Project /

An environmental report is required as part of the FERC licensing of the Susitna Hydroelectric Project, and baseline instream and water quality data effects on normal and seasonal variation must be included. This introductory report identifies the scope and duration of the instream flow assessment b...

Full description

Saved in:
Bibliographic Details
Main Author: Trihey, E. Woody.
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.
Publisher:[E. Woody Trihey],
Report Numbers:SUS 326
Edition:Draft.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:An environmental report is required as part of the FERC licensing of the Susitna Hydroelectric Project, and baseline instream and water quality data effects on normal and seasonal variation must be included. This introductory report identifies the scope and duration of the instream flow assessment being recommended and to provide a framework for coordinating elements of the engineering and environmental studies.
Physical Description:38 p. : 5 maps ; 28 cm.
Notes:"Prepared for Acres American Inc."

"May 31, 1981."

Publication statement from transmittal letter.
Bibliography:Includes bibliographical references (p. 38).