Report on Specialist Consultants Panel Meeting #5, February 17, 1982 /
The fifth Specialist Consultants Panel Meeting was held on February 17, 1982 in Buffalo, N.Y. to review the general arrangements of the Susitna Hydroelectric Project prior to completion of the final draft feasibility report. This meeting met simultaneously as the fifth External Review Board Meeting,...
Saved in:
Alternate Title: | Title on table of contents page: Report on Specialist Consultant Panel Meeting no. 5, February 17, 1982 Report on Specialist Consultants Panel Meeting number 5, February 17, 1982 Susitna Hydroelectric Project. Report on Specialist Consultants Panel Meeting #5, February 17, 1982 Title in the Susitna Hydroelectric Project document index under the entry for no. 1382: External Review Board Meeting #5 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. Susitna Hydroelectric Project. External Review Board. Meeting (5th : 1982 : Buffalo, N.Y.) |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 65 APA 1382 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 65. Document (Susitna Hydroelectric Project) ; no. 1382. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03364cam a2200601Ia 4500 | ||
---|---|---|---|
001 | 1733953 | ||
003 | SIRSI | ||
005 | 20140317093510.0 | ||
007 | cr bn||||a|||| | ||
008 | 030312s1982 akuabd s100 0 eng d | ||
035 | |a (OCoLC)51845823 | ||
040 | |a ALK |c ALK |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S9 |b A378 1982 | |
050 | 4 | |a TK1425.S8 |b A23 no. 65 | |
088 | |a APA 65 | ||
088 | |a APA 1382 | ||
110 | 2 | |a Susitna Hydroelectric Project. |b Specialist Consultants Panel. |b Meeting |n (5th : |d 1982 : |c Buffalo, N.Y.) | |
245 | 1 | 0 | |a Report on Specialist Consultants Panel Meeting #5, February 17, 1982 / |c prepared by Acres. |
246 | 1 | |i Title on table of contents page: |a Report on Specialist Consultant Panel Meeting no. 5, February 17, 1982 | |
246 | 3 | |a Report on Specialist Consultants Panel Meeting number 5, February 17, 1982 | |
246 | 3 | |a Susitna Hydroelectric Project. |p Report on Specialist Consultants Panel Meeting #5, February 17, 1982 | |
246 | 1 | |i Title in the Susitna Hydroelectric Project document index under the entry for no. 1382: |a External Review Board Meeting #5 | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a [138] p. : |b ill., maps, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 65 | |
500 | |a Cover title. | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a Series statement from label on cover of copies that are numbered 65. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |v Congresses. |
510 | 3 | |a Assigned APA Document no. 65 in the Susitna Hydroelectric Project document index. Also assigned no. 1382 in the index under different title and incorrect page count (assumed to be a duplicate entry as the Alaska State Library microfiche copies for these numbers were the same report). | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The fifth Specialist Consultants Panel Meeting was held on February 17, 1982 in Buffalo, N.Y. to review the general arrangements of the Susitna Hydroelectric Project prior to completion of the final draft feasibility report. This meeting met simultaneously as the fifth External Review Board Meeting, thus explaining the two entries in the index under both meeting names. | ||
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |v Congresses. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Susitna Hydroelectric Project. |b External Review Board. |b Meeting |n (5th : |d 1982 : |c Buffalo, N.Y.) | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 65. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1382. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA65.pdf |z ARLIS Document Server |
901 | |a ARLIS |h We decided to keep one copy under each APA number | ||
596 | |a 9 10 23 | ||
977 | |a o51845823 | ||
098 | |a APA 00065 | ||
098 | |a APA 01382 |