Environmental studies. Final report. Subtask 7.05, Socioeconomic analysis /
"The overall objectives of the socioeconomic analysis are to: (1) determine which socioeconomic conditions are most likely to be impacted and to what extent these conditions are likely to change; and (2) provide information that will aid in assessing the significance of potential changes in soc...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Environmental studies. Subtask 7.05, Socioeconomic analysis. Phase I report Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies. Final report. Subtask 7.05, Socioeconomic analysis Subtask 7.05. Socioeconomic analysis Socioeconomic analysis Phase I report |
---|---|
Additional Author(s): | Rogers, Peter Orth, Frank. |
Corporate Contributor(s): | Susitna Hydroelectric Project. Frank Orth & Associates. Terrestrial Environmental Specialists. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 227 APA 370 APA 1297 SUS 51 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 227. Document (Susitna Hydroelectric Project) ; no. 370. Document (Susitna Hydroelectric Project) ; no. 1297. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04932cam a2200865Ia 4500 | ||
---|---|---|---|
001 | 1731346 | ||
003 | SIRSI | ||
005 | 20160525134813.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr cn||a|||||| | ||
008 | 830415s1982 akub bst s000 0 eng d | ||
040 | |a Ak |b eng |c ALK |d RLA |d OCLCF |d OCLCQ |d OCL |d RLA | ||
035 | |a (OCoLC)41698775 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b E58 no. 370 | |
050 | 4 | |a TK1425.S9 |b S95 no. 7.05a | |
088 | |a APA 227 | ||
088 | |a APA 370 | ||
088 | |a APA 1297 | ||
088 | |a SUS 51 | ||
245 | 0 | 0 | |a Environmental studies. |p Final report. |n Subtask 7.05, |p Socioeconomic analysis / |c by Frank Orth & Associates, Inc. ; for Terrestrial Environmental Specialists, Inc. and Acres American, Inc. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Environmental studies. |n Subtask 7.05, |p Socioeconomic analysis. |n Phase I report |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Environmental studies. |p Final report. |n Subtask 7.05, |p Socioeconomic analysis | |
246 | 3 | 0 | |a Subtask 7.05. |p Socioeconomic analysis |
246 | 3 | 0 | |a Socioeconomic analysis |
246 | 3 | 0 | |a Phase I report |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 595 pages in various pagings : |b maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a Authors from page iii: Peter Rogers, Frank Orth, Ron Reisner, Madelaine Jacobs Laurello, Andrew Woolford, Robin Hill, Shirley Ashenbrenner, Teri Schafer. | ||
500 | |a "April, 1982." | ||
500 | |a Page xxxiv numbered incorrectly as xxiv. | ||
500 | |a Errata sheets (6 pages) tipped in. | ||
510 | 3 | |a Assigned APA document no. 370 in Susitna Hydroelectric Project document index. Also assigned no. 227 (duplicate entry which is also a cross-reference to no. 370, a different publication) and no. 1297 (duplicate entry). | |
510 | 3 | |a Assigned number SUS 51 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a "The overall objectives of the socioeconomic analysis are to: (1) determine which socioeconomic conditions are most likely to be impacted and to what extent these conditions are likely to change; and (2) provide information that will aid in assessing the significance of potential changes in socioeconomic conditions. Socioeconomic conditions that receive considerable attention include employment, income, population, housing, public facilities and services and fiscal matters."--Page 1-1. | ||
505 | 0 | |a Introduction -- Description of the project -- Identification of the socioeconomic impact area -- Baseline description and baseline forecasts, by impact area -- Outcomes of the project -- Impacts of the project -- List of literature -- Authorities contacted -- Copies of letters received -- Methodologies. | |
504 | |a Includes bibliographical references (pages 7-1 to 7-25). | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
651 | 0 | |a Susitna River Valley (Alaska) |x Economic conditions. | |
651 | 0 | |a Susitna River Valley (Alaska) |x Social conditions. | |
650 | 0 | |a Hydroelectric power plants |x Economic aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Social aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Regional economics |z Alaska |z Susitna River Valley. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Economic history. |2 fast |0 (OCoLC)fst00901974 | |
650 | 7 | |a Hydroelectric power plants |x Economic aspects. |2 fast |0 (OCoLC)fst00964941 | |
650 | 7 | |a Regional economics. |2 fast |0 (OCoLC)fst01093090 | |
650 | 7 | |a Hydroelectric power plants |x Social aspects. |2 fast |0 (OCoLC)fst00964969 | |
650 | 7 | |a Social conditions |2 fast |0 (OCoLC)fst01919811 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
651 | 7 | |a Alaska |z Susitna River Valley. |2 fast |0 (OCoLC)fst01273501 | |
700 | 1 | |a Rogers, Peter |q (Peter W.) | |
700 | 1 | |a Orth, Frank. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Frank Orth & Associates. | |
710 | 2 | |a Terrestrial Environmental Specialists. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 227. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 370. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1297. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/3/APA370.pdf |z Includes errata sheets at end. |z ARLIS Document Server |
590 | |a ARLIS: Errata sheets in back pocket or stapled on inside cover. | ||
977 | |a o41698775 | ||
596 | |a 9 10 23 | ||
098 | |a SUS 00051 | ||
098 | |a APA 00227 | ||
098 | |a APA 00370 | ||
098 | |a APA 01297 |