LEADER 04218cam a2200709Ia 4500
001 1728159
003 SIRSI
005 20161024124443.0
007 ta
007 cr cn||a||||||
008 880516s1983 akuab bt s000 0 eng d
040 |a ALK  |b eng  |c ALK  |d RLA  |d OCLCQ  |d OCLCF  |d RLA  |d OCL  |d OCLCQ  |d RLA 
019 |a 11540753 
035 |a (OCoLC)17957256  |z (OCoLC)11540753 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F471 no. 648 
088 |a APA 26 
088 |a APA 29 
088 |a APA 648 
245 0 0 |a Subtask 4.5, Socioeconomic studies.  |p Projection assumptions, methodology and output formats /  |c for Harza-Ebasco and the Alaska Power Authority ; by Frank Orth & Associates, Inc. 
246 3 |a Susitna Hydroelectric Project.  |n Subtask 4.5,  |p Socioeconomic studies.  |p Projection assumptions, methodology and output formats 
246 3 |a Susitna Hydroelectric Project.  |n Subtask 4.5,  |p Socioeconomic studies.  |p Draft final, Projection assumptions, methodology and output formats 
246 3 0 |a Socioeconomic studies.  |p Projection assumptions, methodology and output formats 
246 3 0 |a Projection assumptions, methodology and output formats 
246 3 |a Alaska Power Authority response to agency comments on license application.  |p Reference to comment(s): I.497, Subtask 4.5, Socioeconomic studies. Projection assumptions, methodology and output formats 
250 |a Draft final. 
260 |a [Alaska] :  |b [Alaska Power Authority],  |c [1983] 
300 |a [3], 94 pages :  |b illustrations, 1 map ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a Edition statement in middle of title: Draft final. 
500 |a Header statement on cover: "Alaska Power Authority response to agency comments on license application; reference to comment(s): I.497." This indicates that APA used this report as a reference in its response to comments from the U.S. Department of Interior, Office of the Secretary on APA's license application. 
500 |a "July 1983." 
510 3 |a Assigned APA Document no. 648 in Susitna Hydroelectric Project document index. Also assigned numbers 26 and 29 (duplicate enties). 
530 |a Available also in electronic format on the Internet. 
505 0 |a Introduction -- FERC Requirements and needs -- Objectives of the socioeconomic studies -- Overview of the model -- Economic-demographic model -- Public facilities and services -- Fiscal module -- References. 
504 |a Includes bibliographical references (pages 93-94). 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |x Social aspects  |z Alaska. 
650 0 |a Hydroelectric power plants  |x Economic aspects  |z Alaska. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Dams  |x Social aspects.  |2 fast  |0 (OCoLC)fst00887371 
650 7 |a Hydroelectric power plants  |x Economic aspects.  |2 fast  |0 (OCoLC)fst00964941 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a Frank Orth & Associates. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
787 0 8 |i This document represents a reference to comment I. 497 appearing in:  |a Alaska Power Authority.  |t Response of the Alaska Power Authority to comments on the Alaska Power Authority's application for license for major project.  |d [Alaska] : Alaska Power Authority, [1984]  |k Document (Susitna Hydroelectric Project) ; no. 2905  |r APA 2905  |w (OCoLC)41701136 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 26. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 29. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 648. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/6/APA648.pdf  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna/29/APA2903.html  |3 List of all documents related to the responses to agency comments.  |z ARLIS Document Server 
977 |a o17957256 
901 |a 0104  |c TK1424.A4 S98 no.45 
098 |a APA 00026 
098 |a APA 00029 
098 |a APA 00648 
596 |a 9 10 11 23 24