Task 7, Environmental. Subtask 7.04, Water resources analysis. Review of existing water rights in the Susitna Basin /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Task 7, Environmental. Subtask 7.04, Water resources analysis. Review of existing water rights in the Susitna Basin Review of existing water rights in the Susitna Basin Subtask 7.04, Water resources analysis. Review of existing water rights in the Susitna Basin |
---|---|
Main Author: | |
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 471 APA 1295 SUS 419 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 471. Document (Susitna Hydroelectric Project) ; no. 1295. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | 43 p. in various pagings : maps ; 28 cm. |
---|---|
Notes: | "December 1981." At head of title: Susitna Hydroelectric Project. |
Bibliography: | Includes bibliographical references (leaf 21). |