Task 7, Environmental. Subtask 7.04, Water resources analysis. A preliminary analysis of potential navigational problems downstream of the proposed hydroelectric dams on the Susitna River /

This report researches the question: "Will the operation of the proposed Watana and Devil Canyon hydroelectric dams on the Susitna River restrict the movement of vessels during the ice-free months downstream of these dams?"--P.3.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 7, Environmental. Subtask 7.04, Water resources analysis. A preliminary analysis of potential navigational problems downstream of the proposed hydroelectric dams on the Susitna River

Subtask 7.04, Water resources analysis. A preliminary analysis of potential navigational problems downstream of the proposed hydroelectric dams on the Susitna River

Preliminary analysis of potential navigational problems downstream of the proposed hydroelectric dams on the Susitna River
Main Author: Janke, Paul.
Corporate Contributor(s):Alaska. Division of Land & Water Management.

Acres American Incorporated.
Publisher:Alaska Power Authority,
Report Numbers:APA 473

APA 1296

SUS 420
Edition:Rev.
Series:Document (Susitna Hydroelectric Project) ; no. 473.
Document (Susitna Hydroelectric Project) ; no. 1296.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report researches the question: "Will the operation of the proposed Watana and Devil Canyon hydroelectric dams on the Susitna River restrict the movement of vessels during the ice-free months downstream of these dams?"--P.3.
Physical Description:16 p., [15] leaves of plates : ill. ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"January 6, 1982, Revised: March 5, 1982."

Assigned document nos. 473 and 1296 in Susitna Hydroelectric Project document index.