Task 2, Surveys and site facilities. Subtask 2.10, Access planning study /
"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertica...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access planning study Alaska Power Authority, Susitna Hydroelectric Project. Access planning study Surveys and site facilities. Subtask 2.10, Access planning study Subtask 2.10, Access planning study Access planning study |
---|---|
Corporate Contributor(s): | Acres American Incorporated. R & M Consultants. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3 APA 1208 SUS 57 |
Edition: | [Final]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3. Document (Susitna Hydroelectric Project) ; no. 1208. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04126cam a2200757Ia 4500 | ||
---|---|---|---|
001 | 1607174 | ||
003 | SIRSI | ||
005 | 20120831022217.0 | ||
007 | cr cn||||a|||| | ||
008 | 830922s1982 akube t s000 0 eng d | ||
019 | |a 31106342 | ||
035 | |a (Sirsi) CCL138032 | ||
035 | |a (OCoLC)41694569 |z (OCoLC)31106342 | ||
040 | |a Ak |c ALK |d RLA |d ALK | ||
049 | |a ALKA | ||
088 | |a APA 3 | ||
088 | |a APA 1208 | ||
088 | |a SUS 57 | ||
090 | |a TK1425.S8 |b A23 no. 3 | ||
090 | |a TK1425.S9 |b S95 no. 2.10 | ||
245 | 0 | 0 | |a Task 2, Surveys and site facilities. |n Subtask 2.10, |p Access planning study / |c prepared for Acres American Incorporated ; prepared by R & M Consultants, Inc. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Access planning study |
246 | 1 | 6 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Access planning study |
246 | 3 | 0 | |a Surveys and site facilities. |n Subtask 2.10, |p Access planning study |
246 | 3 | 0 | |a Subtask 2.10, |p Access planning study |
246 | 3 | 0 | |a Access planning study |
250 | |a [Final]. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 460 leaves in various foliations (some folded) : |b maps, plans ; |c 28 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a computer |2 rdamedia | ||
338 | |a online resource |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 3, 1208] | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "January 1982." | ||
500 | |a Assigned document nos. 3 and 1208 in Susitna Hydroelectric Project document index. | ||
500 | |a Assigned AEIDC document no. SUS 57. | ||
500 | |a Supplement to this work has been assigned document no. 9 (as well as 1590) in Susitna Hydroelectric Project document index. | ||
500 | |a Supplement to this work has been assigned APA Document no. 9 (as well as 1590) in Susitna Hydroelectric Project document index. | ||
505 | 2 | 0 | |g appendix A. |t Preliminary design development -- |g appendix B. |t Proposed alternative segments -- |g appendix C. |t Alternative comparison: grade, curvature and distance -- |g appendix D. |t Terrain mapping -- |g appendix E. |t Environmental concerns -- |g appendix F. |t Cost estimates -- |g appendix G. |t Barrow pits. |
510 | 3 | |a Assigned APA Document no. 3 in the Susitna Hydroelectric Project document index. Also assigned no. 1208 (duplicate entry). | |
510 | 3 | |a Assigned SUS document no. 57 in the Susitna Aquatic Impact Assessment Project bibliography.. | |
520 | |a "The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--P. 1-1. | ||
530 | |a Available also in electronic format on the Internet. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Transportation |z Alaska |z Susitna River Valley |x Planning. | |
650 | 0 | |a Route surveying |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Roads |z Alaska |z Susitna River Valley |x Design and construction. | |
650 | 0 | |a Hydroelectric power plants |x Estimates |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River Valley |x Design and construction. | |
650 | 4 | |a Access roads |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Dams |x Access roads |z Alaska |z Susitna River Valley. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a R & M Consultants. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1208. | |
043 | |a n-us-ak | ||
596 | |a 9 10 11 23 24 | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA3.pdf |z ARLIS Document Server |
977 | |a o41694569 | ||
901 | |a 3755 |c TK1425.S8A23 no.1208 | ||
901 | |a 0104 |c TK1424.A4S98 no. 2.10a | ||
098 | |a APA 00003 | ||
098 | |a SUS 00057 | ||
098 | |a APA 01208 |