Task 3, Hydrology. Water quality annual report, 1981 /

"This report describes the water quality program conducted by R&M Consultants during Phase 1 of the Susitna Hydroelectric Project, and presents all the water quality data collected to date under Subtask 3.03."--Introd.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Water quality annual report, 1981

Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Water quality annual report, 1981

Water quality annual report, 1981
Corporate Contributor(s):Acres American Incorporated.

R & M Consultants.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 247

APA 459

SUS 18
Series:Document (Susitna Hydroelectric Project) ; no. 247.
Document (Susitna Hydroelectric Project) ; no. 459.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02771cam a2200625Ia 4500
001 1601369
003 SIRSI
005 20120828080519.0
007 cr cn||||a||||
008 990125s1981 akuab bst s000 0 eng d
035 |a (Sirsi) CCL130846 
035 |a (OCoLC)42992102 
040 |a Ak  |c ALK  |d RLA  |d ALK 
049 |a ALKA 
088 |a APA 247 
088 |a APA 459 
088 |a SUS 18 
090 |a TK1425.S8  |b A23 no. 459 
245 0 0 |a Task 3, Hydrology.  |p Water quality annual report, 1981 /  |c prepared for Acres American Incorporated ; prepared by R & M Consultants, Inc. 
246 1 4 |a Susitna Hydroelectric Project.  |p Water quality annual report, 1981 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 3,  |p Hydrology.  |p Water quality annual report, 1981 
246 3 |a Water quality annual report, 1981 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1981] 
300 |a 146 p. in various pagings :  |b ill., 3 maps ;  |c 28 cm. 
336 |a text  |2 rdacontent 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
490 1 |a [Document ;  |v no. 247, 459] 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "November 1981." 
500 |a "December 1981"--Cover. 
500 |a Assigned document nos. 247 and 459 in Susitna Hydroelectric Project document index. 
500 |a Assigned AEIDC document no. SUS 18. 
500 |a Assigned SUS document no. 18 in the Susitna Aquatic Impact Assessment Project bibliography. 
504 |a Includes bibliographical references (last page). 
510 3 |a Assigned APA Document no. 247 in the Susitna Hydroelectric Project document index. Also assigned no. 459 (duplicate entry). 
513 |a Annual report. 
520 |a "This report describes the water quality program conducted by R&M Consultants during Phase 1 of the Susitna Hydroelectric Project, and presents all the water quality data collected to date under Subtask 3.03."--Introd. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Water quality  |z Alaska  |z Susitna River. 
650 0 |a Hydrology  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a R & M Consultants. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 247. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 459. 
043 |a n-us-ak 
596 |a 9 10 23 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/4/APA459.pdf  |z ARLIS Document Server 
977 |a o42992102 
901 |a 3755  |c TK1425.S8A23 no.459  |f dra 
098 |a SUS 00018 
098 |a APA 00247 
098 |a APA 00459