Task 3, Hydrology. Water quality annual report, 1981 /

"This report describes the water quality program conducted by R&M Consultants during Phase 1 of the Susitna Hydroelectric Project, and presents all the water quality data collected to date under Subtask 3.03."--Introd.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Water quality annual report, 1981

Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Water quality annual report, 1981

Water quality annual report, 1981
Corporate Contributor(s):Acres American Incorporated.

R & M Consultants.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 247

APA 459

SUS 18
Series:Document (Susitna Hydroelectric Project) ; no. 247.
Document (Susitna Hydroelectric Project) ; no. 459.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"This report describes the water quality program conducted by R&M Consultants during Phase 1 of the Susitna Hydroelectric Project, and presents all the water quality data collected to date under Subtask 3.03."--Introd.
Physical Description:146 p. in various pagings : ill., 3 maps ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"November 1981."

"December 1981"--Cover.

Assigned document nos. 247 and 459 in Susitna Hydroelectric Project document index.

Assigned AEIDC document no. SUS 18.

Assigned SUS document no. 18 in the Susitna Aquatic Impact Assessment Project bibliography.
Report Type:Annual report.
Bibliography:Includes bibliographical references (last page).