Subtask 7.10, Aquatic studies procedures manual. Phase II. Final draft. 1982-83 (FY 83) /
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10, Aquatic studies procedures manual. Phase II. Final draft. 1982-83 (FY 83) Aquatic studies procedures manual. Phase II. Final draft. 1982-83 (FY 83) Phase II, Final draft. 1982-83 (FY 83) Subtask 7.10, Aquatic studies procedures manual. |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Susitna Hydroelectric Project. Alaska. Susitna Hydro Aquatic Studies. Phase II. |
Publisher: | Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies, |
Report Numbers: | APA 938 RTS 14 |
Edition: | [2nd ed.], 8/31/83 (corrected). |
Series: | Document (Susitna Hydroelectric Project) ;
no. 938. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- I. Introduction
- II. Technical procedures: A. Adult Anadromous Fisheries Studies ; B. Resident and Juvenile Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies ; D. Data processing
- III. Data procedures: A. Adult Anadromous Fisheries Studies ; B. Resident and Juvenile Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies
- IV. Quality control: A. Adult Anadromous Fisheries Studies ; B. Resident and Juvenile Anadromous Fisheries Studies ; C. Aquatic Habitat and Instream Flow Studies ; D. Data routing
- V. Report schedule
- VI. Personnel.